Description
For
- System H61
Operation
- 1st Phase: Blower is in such operation. The S-VAl is open and the B-VAL already and
the B-VAL is closed. The bag is approaching. - 2nd Phase: Bag passed S-VAL already and sits in T-Root.
- 3rd Phase: Blower is blow operation. The S-VAL is closed and the B-VAL is open.
The bag is leaving the T-Root.
Location
The T-Root is located between the send and receive stations in a machine room and connected to the blower.
The two drive through flaps are siting left and right of the T-Root.
Technical properties
Material: PVC and PA
Colour: Grey and transparent
Dimensions 1.0137.6.01 – Drive through flap
Tube: Do110
Weight: ca. 1.60 Kg
Dimensions 1.0137.T.01 – Drive through flap
Tube: Do160